BRIDGE ENGINEERING
Courtesy
of member
Eugene Evans
Even
after you see it, it is still hard to believe ! WaterBridge in
Six years, 500 million euros, 918 meters long....... now this is engineering!
This is a channel-bridge over the River Elbe and joins the former East and West
Germany,
as part of the unification project.
It is located in the city of
To those who appreciate engineering projects, here's a puzzle for you
armchair engineers and physicists.
Did that bridge have to be designed to withstand the additional weight of ship
and barge traffic, or just the weight of the water?
Answer:
It only needs to be designed to withstand the weight of the water!
Why? A ship always displaces
an amount of water that weighs the same as the ship, regardless of how
heavily a ship may be loaded